Work out your first quantity from the number of changes on a busy day, multiplied by the number of days a set is away in the laundry, plus a margin for sets that are lost or retired. Then reorder on a fixed rhythm, topping up the sizes that run short, rather than waiting until the shelf is empty. Planned this way, an OT dress bulk order keeps the theatre stocked through busy weeks without leaving cupboards full of unused sets. This post sets out the method step by step.
The three figures you need
Every quantity calculation for a theatre comes back to three figures. You can gather them from the theatre register and the laundry in a day or two.
- Changes per day. How many times, on a busy day, someone takes a clean set from the shelf. Count everyone: surgeons, anaesthetists, nurses, technicians, attendants and trainees. People who change between cases count more than once.
- Days away. How long a set spends between being worn and being back on the shelf, including the time it sits in the laundry bin.
- Losses. How many sets each month go missing, are damaged or are retired because they have faded or worn thin.
Write the figures down for an ordinary day and for the busiest day you expect. Plan for the busy day.
Working out the first order
With those figures, the first quantity follows a simple pattern:
| Step | What to calculate |
|---|---|
| Daily need | Changes on a busy day |
| Sets in circulation | Daily need multiplied by the days a set is away, plus the sets on the shelf at the start of the day |
| Margin | Extra sets to cover losses and the occasional slow laundry day |
| First order | Sets in circulation plus margin, split across sizes |
Split the total across sizes using your staff list, weighted towards the middle sizes. Our post on sizing a shared pool of OT dress explains how. Bulk orders start from 25 pieces per style, and a theatre complex usually needs well above that once circulation is counted.
Why the laundry matters so much
The number of days a set is away has a bigger effect than any other figure. If sets return the same day, the theatre needs far fewer than if they are away for two or three days. Before you order, talk to whoever runs the laundry and agree a realistic turnaround. If that turnaround changes later, for example when the laundry moves or takes on more work, the theatre’s stock needs to change with it.
Fabric plays a part here too. Poly-cotton dries quickly, which can shorten the time a set is away. Cotton takes longer.
Setting a reorder rhythm
Waiting until the shelf runs empty and then placing an urgent order is the most common pattern, and the most stressful. A steady rhythm works better.
- Count regularly. Count the stock by size at a fixed point, such as the start of each month. A quick count of the shelves and the laundry is enough.
- Note what ran short. Which sizes ran out during the month? Which stacks barely moved?
- Top up, do not replace everything. A reorder can be just the sizes that ran short plus replacements for retired sets.
- Reorder in good time. Place the reorder while there is still enough stock to cover the time it takes to make and deliver the new sets. A bulk reorder still goes through our quality check before dispatch.
- Plan for new theatres or extra lists. If the hospital adds a theatre or a weekend list, raise the stock before it opens.
Some hospitals prefer one larger order a year with planned top-ups; others reorder every few months. Either works, as long as the counts are regular.
Keeping reorders matched
A reorder must look like the first order, or the theatre ends up with two shades on one shelf. Matching starts on the first order: we keep the approved sample, and every reorder is checked against it for colour, style, size marks and embroidery.
On your side, keep a simple record for each order:
- the style, fabric and stock colour name;
- the quantity per size;
- the marking and its position;
- the date ordered and received.
When you send a reorder, quote that record. Changing a detail, such as moving from drawstring to elastic, is fine, but say so, because new and old sets will look different on the shelf. Our post on OT dress through hospital laundry covers when to retire old sets so they do not sit beside new ones for years.
Sending us your figures
Send us your changes per day, the laundry turnaround and your staff size list, and we will suggest a starting quantity and split before quoting. For reorders, send the size counts and your record from the last order. Bulk orders come with a GST invoice and are sent across India by courier or transport. You can see the theatre styles and starting price on our OT dress page, and the full order process on our how to order page.